Home Page

  About Us

  Laboratory
  Products
  Prices

  Contacts

 
 

Advanced Systems for hot & cold Water

Back to TECHNOGREEN index

The Pipes & Accessories

Certificates and specifications

Conduction And Conduction  Way By Caloric welding

Monition And Reservation Procedure

 
 

 

Monition And Reservation Procedure:
  • you must move the TECHNOGREEN pipe carefully and store it horizontally, and don't throw the pipes randomly, then any flaw resultant about bad moving or storing cod execute to filibuster for waters net  .
  • forbidden using the iron coned accessories and the hemp in the conduction with TECHNOGREEN brazen elbows.
  • cut the pipe by the pipe cutter vertically, but when you cut the pipe by a sawfish, don't forget cleaning the pipe.
  • don't use the fire with the pipe, just use the hot air when you need fold it.
  • don't incurrence the pipe and the accessories to directly sun ray as storing in the store or the workshop to long time
  • Be careful when you want cut the pipe... if the weather heat grade was under 0o
  • don't incurrence the pipe to external pressure  
  • don't weld the pipe in the incurrence places to stream cold air 
  • Follow the welding instruction, specially the heating and cooling time.
  • don't warp the pipe more of 10o after the welding operation