Conduction And Conduction  Way By Caloric welding

Back to TECHNOGREEN index

Certificates and specifications

The Pipes & Accessories

Conduction And Conduction  Way By Caloric welding

Monition And Reservation Procedure

 
 

From excellence  Major of TECHNOGREEN :

>The 4 blue lines that stretcher a pipe length for cut it to 4 even section then agree this lines with the fellow badge on accessories that make the installation alike and parallel engineering when you follow the track from point to another point.

>All brazen pieces of TECHNOGREEN within wrapper from the same pipe material to warrant uncontact the water with the brazen.

 

The first step .. Cutting the pipe by the pipe cutter that provide it TECHNOGREEN where the cutting operation by direct and columnar way on the pipe compass

 

Rasp and clean the pipe edge that cut it completion

 
   
 

Dust a badge on the pipe in the place that you want weld it with the elbow. but you must coincidence the blue lines on the pipe with the same on the accessories

   
 
   
  Use the caloric welding device that provide it TECHNOGREEN and weld the pipe with the elbow in the same time
   
 
   
  After expiring the time limited of welding, expel the pipe and the elbow from the welding device in the same time....
   
 
  Fixing the pipe into the plastic elbow without double or fold
 
To security welding operation activity and right TECHNOREEN arrive the following table for illustration reckoning operation the caloric welding and cooling  time and weld length .

Pipe compass

Weld length calefaction time Waiting Time Cooling Time
20mm 14mm 7sec 4sec 2min
25mm 16mm 7sec 4sec 2min
32mm 20mm 8sec 6sec 4min
40mm 20.5mm 12sec 6sec 4min
50mm 23.5mm 18sec 6sec 4min
63mm 27.5mm 24 8sec 6min